&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
wear resistant ceramic adhesiv > ceramic installation trowel grade epoxy bonding agents

ceramic installation trowel grade epoxy bonding agents

ceramic installation trowel grade epoxy bonding agents
BD121 ceramic installation trowel grade epoxy adhesive bonding agent

Performance feature of BD121 epoxy bonding agents for ceramic tile installations:
1. It’s the two component adhesive compounded by modified toughening resin and special curing agent.
2. Aging resistant,with good water resistance,good toughness and high strength.
3. Can cure at room temperature,can also heat for curing
 
Product usage:
Used in the bonding of wear resistant ceramic chip on the top surface and facade of the equipment.With strong initial adhesion,it won't
fall off without using magnet or other support measures during construction,optimizing construction technology and reducing construction cost.
 
Performance index:

Product name physical state Standard packing operation time limit
(25¡æ)
Curing time
(25¡æ)
Range of application
 BD121  paste 5kg/set 0.5h 12h Used in the self-adhesion and each-adhesion between metal and ceramic etc materials.Especially used in the bonding of wear resistant ceramic chip on the ceiling and facade of the equipment which suffers ash powder scour and material scour or erosive wear.
Item Color Density
(g/cm3)
Shear strength
(Mpa)
GB7124-2008
Impact strength
(J/cm2)
GB6328-1999
Tensile strength
(Mpa)
GB6329-2008
Compressive strength
(Mpa)
GB1041-2008
Working temperature
£¨¡æ£©
BD121 white 1.24 15 56 79 92 -60-150

How to use of BD121 ceramic tile installing bonding trowelable epoxy compound adhesives: 
 1. Surface treatment: Clean up the dust,greasy dirt and rust on the surface of adherend,then grind or sand blast treatment,finally clean it
by cleaning agent and dry it by airing.
 
 2.Configure adhesive: According to the specified requirement,make A and B components mix uniformly,the mass ratio A:B=4:1. When the
temperature is low in winter,can preheat the A component up to the temperature of 40-50¡æ in advance for easy to mix using.
 
 3.Using adhesive: Make the configured adhesive be coating on the adherend surface uniformly,then fold it,knock on it for once from the middle
to all around with rubber hammer,avoid the air getting into it.Double spread will get the better effect,under the premise of no shortage adhesive,
the adhesive layers are the thinner the better.
 
 4.Curing: Room temperature initial curing for 4 hours,full curing for 24 hours,when the temperature is low in winter,can heat it up to the
temperature of 80 deg C slowly and keep this temperature for 2 hours after placing it for 2 hours.
 
Packing specification:
Packed in a plastic drum, A component: 4Kg/drum, B component: 1Kg/drum,12 drums/carton or 8 drums/carton.
 
Transportation storage:
Sealed storage in the cool and dry place.The warranty period is 1 year.Avoid placing it upside down,knocking against and transporting it as
a non-dangerous product during transportation.
 
Special version:
1.This parameter is for laboratory conditions,due to the actual working condition is more complex,suggest the users to  do the pretest according to actual working condition
 
2.When the environment temperature is below 15 deg C,the curing time will prolong,should take proper heating measure.
 
3.When the environment temperature is more than 25 deg C or the mixing quantity is too large,the curing speed will expedite,should properly
shorten the application time of coating after mixing.
 
Construction protective measures:
1.Wear the protective masks,wear the protective glasses and rubber gloves
2.Need washing hands with soap before eating,drinking or smoking.
3.The health hazard after touching: a few people will have skin allergy phenomenon,see a doctor in time and avoid touching with this product again.should wipe it with ethyl acetate when the sizing material paste on the skin by careless,then wash it with clear water.Should wash it with
clear water immediately and see a doctor when splashing into the eyes by careless.
 
Warm Prompt£º
Residual adhesive solution cured products are non-toxic harmless organic solid,but maybe it will produce poisonous gas when burning,
non-professional personnel can not do combustion disposal,should be sent to garbage power plant or garbage burning place treatment.
 
fire prevention measures£º
Should choose dry powder to extinguish fire,can cover and flap it with dry powder,grit(the construction using abrasive) or the non chemical
fiber fabric when the sizing material catching fire.

Packaging photo of our BD121 ceramic bonding installation special epoxy trowel grade compound:


------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337